
Moon wood: how to obtain it
A step-by-step guide, from choosing the tree to dry beams
◐ Under study
Moon wood is wood felled while the tree is dormant, from October to February, during the waning Moon, and then slowly air-dried. Carpenters in the Alps have done this for centuries, and in our time the Austrian forester and entrepreneur Erwin Thoma made it famous. The felling rules in this guide come from his calendar. Everything we added from older tradition or from joiners' practice is marked separately.
What science says
What is certain is that wood felled in winter and dried slowly in the air is good: it has less sap, tastes worse to bark beetles and cracks less. The effect of the Moon itself is disputed. Thoma's company states, citing research by Prof. Ernst Zürcher of ETH in Zurich, that wood felled during the waning Moon is 5–7% denser. A large Swiss study by Zürcher and colleagues (2010, 576 spruces and chestnuts felled on 48 dates) found small but statistically significant differences in drying, shrinkage and density depending on the phases of the Moon. Other studies, including on oak and on the flammability of wood, found no differences. So stick to the calendar, since you lose nothing, but remember that winter, a good tree and patient drying give the most anyway.
What it gives, according to Thoma
This is how Erwin Thoma describes his wood, based on tradition, his own experience and the research of Prof. Ernst Zürcher. The studies confirmed only some of these differences, and they are small, so treat this list as his promise, not a guarantee.
- More durable and more resistant to weather: Thoma writes that wood felled during the waning Moon is especially durable and withstands rain, sun and frost better than wood felled at the usual time.
- Denser o 5–7%: According to Thoma, such wood holds more water bound in the cell walls. When drying it shrinks a little more and becomes denser, on average by 5–7% in several thousand samples.
- Stronger in compression: Greater density means, according to Thoma, greater compressive strength, which matters in beams and walls.
- Resistant to fungi and insects: Thoma states that wood from winter and the waning Moon resists fungi, bark beetles and other pests better.
- Cracks less and is very long-lasting: Thoma's calendar says that such wood cracks less and lasts exceptionally long.
- Burns less readily so Thoma claims: Thoma writes that denser wood resists flames better. Studies on the flammability of wood felled in different phases of the Moon did not confirm this difference.
- No chemicals no wood preservatives: Thanks to these properties, Thoma uses no chemical wood preservatives or glues in his houses. The wood is protected by the construction: the roof, water drainage and ventilation.
When to fell
- From October to February: This is what Thoma's calendar says. It is the tree's dormant period: it does not grow and the sap is still. Thoma allows September and March only in an emergency, high in the mountains or after a very harsh winter.
- Only during the waning Moon: From the day after the full Moon up to and including the new Moon. Thoma's calendar says it outright: fell only in this phase. During the waxing Moon, trees for beams are not felled.
- The last days before the new moon: Some old folk calendars value most the few days just before the new Moon. Thoma does not single them out in his calendar: the whole waning phase is good.
- The date alone is not enough: Thoma stresses that the tree and what happens afterwards also matter: slow-growing wood, from higher elevations, slow drying, careful processing and structural protection instead of chemicals.
- Winter 2026/27: 1 October 2026 – 10 October 2026
- Winter 2026/27: 27 October 2026 – 9 November 2026
- Winter 2026/27: 25 November 2026 – 8 December 2026
- Winter 2026/27: 25 December 2026 – 7 January 2027
- Winter 2026/27: 23 January 2027 – 6 February 2027
- Winter 2026/27: 22 February 2027 – 28 February 2027
- Winter 2027/28: 16 October 2027 – 29 October 2027
- Winter 2027/28: 15 November 2027 – 28 November 2027
- Winter 2027/28: 14 December 2027 – 27 December 2027
- Winter 2027/28: 13 January 2028 – 26 January 2028
- Winter 2027/28: 11 February 2028 – 25 February 2028
Where to legally get a tree
A tree on your own plot
If you are a private person and the felling does not serve a business activity, you can cut down most trees without a permit. When the trunk circumference measured 5 cm above the ground exceeds 80 cm (poplar, willow, box elder and silver maple), 65 cm (horse chestnut, black locust, plane tree) or 50 cm (other species, including spruce, pine and oak), you must report the felling to the municipal office. An official inspects the tree within 21 days, then the municipality has 14 days to object. If there is no objection, you fell within 6 months of the inspection. Report in autumn, and you will fell within the winter window.
Your own forest
In a private forest you fell in line with a simplified forest management plan or a decision of the starost. Timber from a private forest must be marked before transport, and the starost issues a certificate of legality of harvesting. Ask at the starosty or the forester who supervises private forests in your municipality.
From the State Forests
In state forests you cannot fell trees yourself: self-harvesting covers only small wood and firewood, without bringing trees down. But winter felling goes on anyway. Ask at the forest district office when they will fell spruce, fir, pine or larch in the chosen forestry, and ask for logs from a specific date. Private persons buy through retail sales at the forest district office, in small quantities, according to the price list and rules of that forest district.
Ready-made wood from a sawmill
More and more sawmills and carpentry shops accept orders for winter felling. Ask for a document with the felling date, species and place of origin. Ready-made beams of certified moon wood are also sold by companies in Austria and Germany, including the Thoma company. Without the felling date on paper, it is just a trade name.
Step by step
- Choose the tree in autumn: For structures: spruce, fir, larch or pine. For floors and furniture: oak, ash, larch. Look for a healthy, straight trunk without rot, cracks and large knots in the lower part. Thoma values most the wood that grew slowly, in higher and cooler places. Mark the tree together with the forester or the owner and plan which way it will fall.
- Felling in the chosen window: The felling should be done by someone with a chainsaw operator course, wearing a helmet with face and hearing protection, cut-resistant trousers and boots. Never alone. Tradition says: bring the tree down downhill, crown downhill. If you do not have the qualifications, hire a lumberjack, and write down the date and Moon phase yourself.
- Let it lie with its crown: Traditionally the tree lies for several weeks with its whole crown and branches. The needles keep evaporating water and “suck” it out of the trunk. Only then are the branches trimmed and the trunk cut into logs. Debark the logs quickly, before the bark beetles start moving in spring.
- Skidding over snow: Logs are hauled out while snow lies or the ground is frozen. A horse or a light tractor damages the forest and the wood less. Protect the log ends with wax or paint so that they do not crack.
- Sawing at the sawmill: Saw the logs before spring. Order dimensions with an allowance for shrinkage, usually a few percent across the grain. For structural beams it is best if the pith stays in the middle or outside the piece, because then the wood cracks less.
- Air drying: Thoma dries wood slowly, in the air, without any chemicals. Stack the sawn timber in a pile on supports 30–50 cm above the ground. Place spacers of the same thickness (2–2.5 cm) every 50–60 cm, always one above the other. Provide a roof, but leave the sides open. Joiners allow roughly one year for every 2.5 cm of thickness, and thick beams dry longer.
- Check the moisture: Use a moisture meter to measure in several places, including inside the stack. For sheltered structures the wood should have at most 20% moisture, outdoors at most 23%, and for gluing, floors and furniture about 15% or less.
- Buduj: Thoma joins solid wood with dowels, without glue or metal. You can start with smaller things: a table, a floor, a shed, a beehive. Write down in a journal how the wood behaves: whether it cracks, whether it warps, whether bark beetles get it.
Certificates and approvals
First things first: “moon wood” is not an official certificate in any country. It is a statement of when the tree was felled. Whether you may build a house from the wood depends on the ordinary approvals for structural timber. Moon wood needs them just like any other wood.
- Felling date (deklaracja): Written confirmation of the felling date and place. There is no state “moon wood” label, so this is the only proof. Ask for it on the invoice or the delivery note.
- CE mark and declaration of performance (obowiązkowe): Structural timber sold in the EU must carry the CE mark and a declaration of performance under EN 14081-1. The producer runs factory production control with a notified body.
- Strength class (obowiązkowe): Load-bearing beams must have a strength class, most often C24 for spruce and pine. It is set by a certified grader (visually) or by a machine at the sawmill. Wood from your own forest also has to be graded before it goes into a structure.
- European Technical Assessment (dla systemu): Thoma’s Holz100 system (walls of boards joined with beech dowels, no glue) has European Technical Assessment ETA-13/0785, issued by the German DIBt in 2013 and renewed in 2018. It approves the system for load-bearing elements and assumes a service life of at least 50 years. Before that it had the German approval Z-9.1-574.
- Fire resistance (dla systemu): The REI class says how many minutes a wall keeps its load-bearing capacity, integrity and insulation in a fire. According to the producer, a 36.8 cm Holz100 wall has REI 120. Full data are in the producer’s technical documentation.
- Origin and ecology (dobrowolne): FSC and PEFC confirm wood from responsibly managed forests. Poland’s State Forests (Lasy Państwowe) hold these certificates. According to the producer, Holz100 has Cradle to Cradle Gold certification. The forest certificate must be stated on the invoice; a company document alone is not enough.
Where you can build wooden houses
You may build a wooden house, moon wood included, in each of these countries. What differs are the required approvals, the fire rules and the places where wood is restricted.
Poland: Allowed
You can build a wooden house anywhere the local plan or the zoning decision allows a single-family house. In Podhale some plans even require wood and a traditional form.
- Structural design to Eurocode 5 (PN-EN 1995-1-1).
- Load-bearing timber with the CE mark and a strength class, e.g. C24.
- A house of up to 70 m² footprint and up to 2 storeys can be built on notification with a design, without a permit (structural span up to 6 m).
- A wall with windows at least 4 m from the plot boundary, without windows 3 m.
- Wooden walls and roofs may need larger distances from neighbouring buildings for fire reasons. The designer sets this under the technical regulations.
Trudniej: Limits come from the local plan and fire distances on tight plots.
Austria and Germany: Allowed
The home of moon wood. Thoma builds houses, hotels, schools and offices from Holz100 here. The system has a European Technical Assessment, so a designer can use it anywhere in the EU.
- Building rules are national and regional (Länder), and in Germany based on the model building code (MBO).
- In recent years Germany has relaxed its rules and also allowed wood in taller buildings, with extra fire requirements.
- Load-bearing timber as across the EU: CE, declaration of performance, strength class or an ETA for the system.
Trudniej: Tall timber buildings need additional fire protection.
Japan: Allowed with conditions
Japan has a huge wood tradition, and according to Thoma a church in Hara Mura near Fukushima was built with the Holz100 system. After the war, however, the 1950 building law strongly restricted wood in cities for fear of fires.
- In a 防火地域 zone (bōka chiiki, dense city centres), a three-storey wooden house, or a two-storey one over 100 m², must be a fire-resistant building.
- In a 準防火地域 (semi-protected) zone a three-storey wooden house is possible, but with fire-protective cladding, e.g. gypsum boards.
- Since 2000, fire rules have been performance-based, which makes it possible to design fire-resistant timber buildings.
- Buildings must meet strict seismic standards. Imported wood and panels need the Japanese JAS standard or an individual ministry approval.
Trudniej: It is hardest in dense city centres in fire zones.
Texas and the USA: Allowed
In the USA most houses stand on a timber frame, so a wooden house is the norm. Texas has no single code for the whole state.
- Cities use a code based on the International Residential Code (IRC).
- Since 2009 counties may adopt their own code for areas outside cities. Some rural areas require only minimal rules.
- Structural lumber must bear a grade stamp. CLT panels in multi-storey buildings must meet ANSI/APA PRG 320.
- The IBC 2021 code allows mass timber up to 18 storeys.
- The IRC requires protection against subterranean termites, which matters in warm Texas.
- A house in a system similar to Holz100 has already received a building permit in Walnut Creek, California.
Trudniej: On the Gulf of Mexico coast hurricane rules apply, and in wildfire zones (e.g. California) the facade must be ignition-resistant.
In Japanese city centres in fire zones, in bushfire and wildfire zones (California, Australia with the AS 3959 standard), on hurricane coasts and where termites feed. You can build everywhere, but with extra protection.
Your own study
Do your own study. Fell two similar trees from the same place: one during a waning Moon just before the new moon, the other during a waxing one. Cut them the same way, label them and dry them in one stack. After 3, 6 and 12 months measure the moisture, weigh the boards and count the cracks. Describe the result below this page, because exactly such comparisons are missing.
Sources
- Thoma: kalendarz ścinki księżycowego drewna, wrzesień 2026 – marzec 2027 (PDF)
- Thoma: Mondholz – drewno ścięte we właściwym czasie
- Thoma: Mondholz w budownictwie (Holz100)
- Erwin Thoma (1999): …dich sah ich wachsen. Über das uralte und das neue Leben mit Holz, Wald und Mond
- Zürcher E. i in. (2010): Looking for differences in wood properties as a function of the felling date, „Trees” 24
- Wywiad z prof. Ernstem Zürcherem (wissenschaft.de)
- LfL Bayern: Mondphasenholz (PDF)
- Villasante i in.: dąb a faza Księżyca, „Forest Products Journal”
- Der Standard: Der Mythos Mondholz (głos krytyczny)
- Ustawa o ochronie przyrody, art. 83 i nast. (ISAP)
- Ustawa o lasach, art. 14a: cechowanie drewna (ISAP)
- kb.pl: progi obwodu pnia przy wycince na działce
- Nadleśnictwo Gdańsk: regulamin sprzedaży detalicznej drewna
- Murator: wilgotność drewna na więźbę
- DIBt: ETA-13/0785 THOMA Holz 100 (PDF)
- DIBt: dopuszczenie Z-9.1-574 (2005, PDF)
- MaterialDistrict: Holz100 (Cradle to Cradle)
- Infobuildenergia: Holz100, dane techniczne (REI 120)
- Thoma: kościół Hara Mura w Japonii
- Warta: konstrukcje drewniane, normy i CE
- Murator: odległości a przepisy przeciwpożarowe
- Murator: domy do 70 m² na zgłoszenie
- Japonia: Building Standards Act (tłumaczenie)
- Edogawa: drewno w strefach pożarowych (jap.)
- Setagaya: trzykondygnacyjne domy drewniane (jap., PDF)
- Texas State Law Library: kodeksy budowlane
- WoodWorks: drewno do 18 kondygnacji w IBC 2021
- AIA: dom z litego drewna w Walnut Creek